Corro mount plates address the all to common problem of no flat surface when mounting your fittings onto a corrugated or custom orb wall.
Mounting things to a corrugated metal panel wall.
This 2 corrugated steel siding can be used in both vertical and horizontal applications and is available in a variety of colors.
Using an adhesive such as liquid nails spread the adhesive on the back of the tin.
Finish the first side of the roof.
Insert a screw in a furring strip every place it crosses a wall stud.
Use a strong painter s tape to hold the panels together until the adhesive dries.
The corrugated metal wall panel is ideal for a variety of marketplaces including residential light commercial agricultural and storage facilities.
The corrugated panel is a traditional economical wall or roof panel.
Place the drill on the marked spot.
We offer several corrugated metal wall panel profiles.
Turn the drill on and hold it level as you drill.
The panel is available in smooth or stucco embossed texture depending on material.
Buy the metal panels.
Place the tin against the wall pressing firmly.
Start at the bottom of the wall and install the first strip one inch above floor level.
Stop drilling when tape reaches the wall.
Studs are typically 16 or 24 inches apart.
Lay and secure the first metal panel.
Your second piece will overlap slightly.
It is installed horizontally or vertically with exposed fasteners.
2 corrugated metal roof installation instructions.
Panels can be installed directly to studs or on top of an existing sub surface such as plywood or drywall.
Install the rest of the strips 24 inches apart and finish with an additional strip at the top of the wall.
These plates are available in zincalume galvanised gal colorbond and stainless steel call us.
Find and save ideas about corrugated metal on pinterest.
Lay the roofing felt.
Corro mount plates for mounting on corrugated or custom orb cladding.
Lay and secure the metal panels on the other side.
Works with all standard custom orb and corro profiles not mini orb.
If you are installing over an existing surface mark the studs with a pencil before installing panels.